Material requirements planning (MRP)

12-week horizon

Material × week grid

OK ▽ below minimum level negative balance (material shortage)

Colour is always backed up by a number or symbol too: a ▽ triangle for a level below minimum, a negative number for a material shortage. The closing balance in a cell = opening balance + planned receipts − that week's demand (the full breakdown is in the cell's tooltip).