Back to gallery Operations and projects

Technician capacity planner

8-week schedule

Drag a bar with your mouse to move it, or drag its right edge to resize it. With the keyboard: the arrow keys move it, Shift with the arrow keys resizes it. Overlaps for the same technician are highlighted in red.

Technician utilisation

The vertical mark shows 85% — the target utilisation, above which there is no room left for emergency call-outs.

Schedule conflicts